Expired Construction Scheduler jobs in Casa Grande, AZ
Casa Grande, AZ
$13,790-$173,818/year (est.)
Leading the future in luxury electric and mobility At Lucid, we set out to introduce the most captivating, luxury electric vehicles that elevate the human experience and transcend the perceived limitations of space, performance, and intelligence. Vehicles that are intuitive, liberating, and...